Showing posts with label knitting. Show all posts
Showing posts with label knitting. Show all posts

Saturday, April 16, 2011

Why is it? A slice of reality

I have kept track of my yarn in a data base for years now. Since before we left New York. I remember sitting in the dining room of the house and weighing each yarn, using the McMoran yarn balance to find out yards per pound then figuring out how many yards of each yarn was on hand.
I lost a good bit of the database recently, I believe I started it in 02. So I have had plenty of time to adjust to adding yarns to it.
So why is it that every so often I come across a yarn that isn't in the stinking data base? Hello? How did I miss you? Tonight it was 2 skeins of a Regia Kaffe Fassett yarn. Now I've knit up 2 pairs of socks in various colorways of this yarn. I knew I had a lonely skein that will become either sock tops or wristwarmers. But I didn't remember this yarn. I don't remember buying it. I don't show a record of it coming in. Where in the world did it come from? sigh Any such yarn counts as a brand new purchase. And it is added in the "yarn purchased this year", "yards added this year" etc. The only way I can figure to make it work. Otherwise I'd constantly be reworking prior years totals.
Occasionally as I cook I realize how time has passed. As in, when I need to pull one of the boxes off the top of the freezer. Why? The aluminum foil is from Wegman's - the WONDERFUL New York grocery chain. I miss their bread. It was the best! We left New York in 03. The waxed paper is from Hy-Vee - an Iowa grocery chain. We left Iowa in 08. There are 2 boxes of Press and cling wrap (or whatever it is called.) We bought those in Iowa when Howard had the surgeries. Yet I think I'm on the 3rd box of parchment paper since we moved here a year ago.
My space bar has been sticking. I couldn't figure out why. Tonight I hit one of the keys and realized -- a size 0 needle had dropped down in front of the first row of the keyboard. Funny, the space bar works fine now!

Sorry!

Sorry! I've been trying to decide if I have enough to say that people are willing to take time to read it. I have been knitting. And knitting. One of the ladies in the building remarked the other day that I don't look right without needles in my hand. I finished a sweater today and the recipient was thrilled. After I gave it to her I noticed 2 strands I hadn't woven in. I offered to take it back and finish, she quickly told me that she'd be perfectly happy doing it. Hm...afraid I'd not give it back? grin We are having a Minnesota spring. The snow went from several feet high to nothing in about a week and a half. The grass has been greening up, the birds have returned. Last night we had snow again. Not a lot, thank goodness, but enough to remind us that it isn't time to put away our winter gear. So, there are people from this area who are snowbirds in Arizona. We also have someone from Saskatchewan that snowbirds HERE! Perspective, I guess. She considers our winters to be mild. Hm...

Monday, January 17, 2011

Mom said there'd be times like this...

I started a sweater (jumper) for Rick in London UK. Ran out of yarn just before the hood, so no way I can fudge it. I'm waiting for more yarn to get here.

I started a sweater for Geina, his Mom. It looks as if I may run out of yarn just before the end. I'm going to knit fast to see if I can avoid it. (Why yes, if you need to know, I ascribe to the "knit faster and maybe the yarn will last" theory of knitting.") According to my stash spreadsheet, there should have been 8 skeins of this yarn, which would have been more than plenty. Why, then can I only find 6!!!!!!

I'm afraid to start anything else!

All of my works in progress were going down, until I only had 2 left - the pair of socks and Hanne Falkenberg's Solo (in different colors, but you get the idea.) I had finished the baby blanket and Stacey's sweater. The over item that had started the year with me will be frogged tonight. Bliss! Only 2 WIPs. The socks would take maybe 2 days max of intermittent knitting. But could I just complete those, and be down to NO WIPs? Noooo, I cast on for Rick's sweater. See paragraph 1. I cast on for Geina's sweater. See paragraph 2. Now I have four WIP's and there is great temptation to cast on more. SHEESH!

I even made a list of things that I'd like to knit up next. I think there are about 10 things on it!

Thursday, January 06, 2011

Yay!

Yesterday was a GREAT knitting day for me! I finished the Sprog 3 blanket, well at least MY part - Howard needs to crochet around the edges before it is totally done.

I also finished Liquid Silver for my Sister-in-law. It had been on the needles for too long, I broke a bone in my hand in the middle of it, which caused the process to grind to a halt. I finally picked it up yesterday and was astonished to realize how very little was left to do! So, I did, then popped it in the mail today. I forgot to photograph it until it was already at the post office. Oops!

I waffled between working on the current socks or starting something else. I'll admit it, I looked closely at the socks, put them down and started a new sweater. Toddler size -- quick knit! Yay!

Friday, December 31, 2010

End of Year totals

So, this is when each of us looks back on the year, good, bad and ugly. It has been a momentous year. Not all good. Not all bad.

Birth of Merridyth Ann - highlight
Moving to Minnesota to be closer to Nathan and his family - highlight
Losing my job - low point

My knitting totals for the year:
Christening Gown 1
Hats 6
Potholders 4
Scarves 3
Scrubbies 4
Sweaters 1 baby
Sweaters 2 child
Washcloth 1
Wristers 2 pair

When I factor in having to move, I didn't do too badly this year! Tonight I'll frog the project that isn't working so it isn't on the needles in 2011. I'll only have projects on the needles that will be finished. Not a bad way to start the year! I'd prefer not to have ANY projects on the needles, so I can start the year with a clean slate, but that ain't gonna happen this year! I refuse to frog the projects that are working, that just aren't done!

I made a concerted effort to pare down the stash. Giving yarn away, using it up. I started the year with 1,118.09 ounces of yarn, or 69.88 pounds. That also translated to 119,464.64 yards of yarn, or 67.88 MILES of yarn. The stash was worth approximately $2,572.17 on January 1, 2010. I purchased 247.16 ounces 16,206 yards.

Currently I have 719.11 ounces or 44.95 pounds of yarn on hand (including the projects on the needles, they don't get to count against the totals until finished.) That is 73,718 yards or 41.885 miles of yarn. Current approximate value of stash is $1,659.61. Not bad! Actually, I'm pretty proud of that!

Thursday, December 30, 2010

End of the year

Today I am taking a hard look at projects on my needles. One of the items on the needles isnot working. It is time to FROG! I'll do something with this yarn at a later date.

I do NOT want anything on the needles that I do not love or that will not be loved by the recipient.

As far as I remember, here are my projects on the needles:
  • a pair of socks for me - one is to the heel, the other is on the heel flap
  • Solo for Serena - about 1/2 of the body is finished - need the other half and 2 sleeves
  • Liquid Silver for Stacey - so close to being finished - just DO IT!
  • Sprog 3 baby blanket
  • Cross-over Rib top for me - going to frog the colors are pooling

I would like to start working on the items that are closest to being finished. That would probably be Liquid Silver, then the socks, then baby blanket and finally Solo.

I have a whole slew of projects that I WANT to start. I don't want to list them, my goal is to knit away happily! Most of the projects are for others, which is fine.

I've been destashing - passing yarns on to others who want/need yarn. If I'm not going to knit it, why is it waiting here?

Here we are in cold Minnesota. And it is raining. Blech. Perhaps elsewhere that would be cause for rejoicing. Here, it is cause for great worry. Because it is supposed to change to freezing rain, and then snow. Which means all of this lovely rain is going to change to ice. Which may, perhaps, last most, if not all ,of the rest of this winter. There are some fragile people in this building. This will mean they are restricted to home until the ice is gone. For some reason, the mood in the building isn't excited. grin

Honestly, I'm not happy about the ice. I remember breaking my wrist on ice. It is 10 miles for Howard to get to work. That is a long stretch of road to be ice covered.

ETA: So, I must be perverse. I made that list above. Decided that to finish Liquid Silver made the most sense. So what did I pick up? The BABY BLANKET! sigh I really do NOT do well with to-do lists.

Tuesday, December 21, 2010

Oops

And then I started thinking...I still have the top for DSIL on the needles. Stopped knitting it when I broke my hand. Rats. One more project. Did I remember everything now?

Um, and there is the vest I started just last month. How did I forget that? Sheesh!

The socks I mentioned: I have 4 that came in the swap. One has been finished. "Only" 3 more to go.

For pete's sake! I have a memory like a sieve for projects in process!

Monday, December 20, 2010

Eek!


So, I was looking on my blog today. I had knit a scarf while in Iowa, and was looking to see if I had blogged about it. Maybe I had, but I didn't see the pictures. I remember blocking the scarf, and it was in the house before it was torn down, so I could establish when and where it had been knit from memory. But I don't see, on the blog, what it was. Oddly enough, I can remember where the design CAME from! sigh


ETA, I found the pattern! Later in the blog. Wrong designer! I designed it! I don't know whether to be embarrassed that I remember so poorly or glad that I liked it so well that I wanted to knit it again!


Even worse, I looked at the post for the end of the year in 2004. MOST of the "to do" list for 2005 have NOT been done! Do you realize how embarrassing that is? Here is the list:


  • Serena's replacement graduation sweater (high school) Nope

  • Howard's sweater Done

  • Socks to be kitchenered Nope

  • My Lind Done (and fulled then cut into hotpads/potholders

  • Elsbeth Lavold tunic (back knit up by Dianne on machine, waiting for me) Nope

  • Unst Bridal Shawl Nope yarn given away, pattern sold

  • Princess Line Nope yarn used for other project

Isn't that ... sad? 7 projects on my "to do" list, and I actually did 2. And it was already knit, just needed the seams and hem. sigh Maybe it would be best if I don't plan ahead. That is the only time I did post such a list on the blog. Whew!


Right now I have the following on the needles:



  • sprog 3 baby blanket

  • a pair of socks (both are to the heel)

  • I still have the sweater back that Dianne knit up on her km, but I haven't knit anything up

  • the socks that need kitchenering still need it - they aren't on needles, do they count?

Oh well. Another day. Another try. Maybe if I read what I write occasionally...


Saturday, November 27, 2010

Hm

My camera was among the missing for almost a week. I have no idea why it was hiding in the bathroom. All I can do is roll my eyes (I am sure I was the culprit, but why? Perhaps it is better NOT to know!)

This month I decided in a fit of insanity to join in NaKniSweMo, National Knit a Sweater Month. The idea is to knit 50,000 stitches in the month of November, at the end the knitter will have a sweater to show for the effort. I didn't want to be working on a sweater, but had two projects that would make my total. I started a hat for Big Justin and picked up my portion of the 3 generation baby blanket for Merri. I finished BOTH on the 24th. 87,442 stitches between the two projects. I am no longer counting stitches for the month. I did make and finish a hat for someone else, and still have knitting time this month. Do I finish projects on the needles? Probably. But how nice to get these out of the way!

Pictures will have to come at Christmas, after the presents have been gifted.

Thursday, November 18, 2010

NaKniSweMo

Okay, I admit it. I'm a glutton for punishment.There is another side to NaNoWriMo - National Novel Writing Month. That is NoKniSweMo - National Knit a Sweater Month. Knitters pledge to knit 50,000 stitches during the month of November, most planning to knit a sweater, starting November 1 and finishing before the of day November 30.

I wasn't going to do it, really truly! But then I started doing the math for a hat for DSIL - 3 ply yarn on 0 needles. I realized that it would take pretty close, if not more than 50,000 stitches. So, I signed on to the bandwagon November 8th. You will notice that I was already behind the eight ball, eh?

I decided to add Merri's baby blanket (the three generation one) to the mix, to give my hands relief, worsted weight for a while, then sock weight. Back and forth, forth and back. So, I started a spreadsheet, to track the stitch count on both projects. The other night I realized that I was close to the 50,000 stitches, but neither project was close to completion. My current goal is to finish both projects by the end of November. Insanity? Probably. I'll let you know the final stitch count at the end of the month. Can I do it? Dunno. But next year I will plan the project ahead of time!

Sunday, October 17, 2010

Rats!

Remember just last post when I rejoiced that I'd finally used up all of that black 3 ply Kroy sock yarn? Yeah, the exhiliration lasted less than 24 hours, I was looking for a different yarn, and found an entire bag of the stuff. I don't know, but I'm beginning to suspect it of breeding. I lost my yarn data base due to an unexplained computer error, so I can't tell when I bought it. I think I created the original yarn database in 2002, I know I had the yarn before that, because I made Howard several pairs of over-the-calf dress socks from it. I stopped in the middle of a pair in 2003 when he told me that purchased socks were more comfortable. I don't think I've made a pair for him since.

I'm making cranberry oatmeal cookies from my archive. I had thawed 2 packages of cranberries, so tripled the recipe. There were going to be so many cookies, I decided to try them as bars instead of drop cookies. I'll update as to how they turn out.

I made 2 scarves from Sally Melville's book with her daughter, "Mother-Daughter Knits". I used the tabbed scarf pattern. The second was a variation on the theme, I only had 2 buttons that went really well with the yarn, so I made 2 tabs instead of 3. I think I'll make one more of the 3 tab version of the same yarn I made the first (alpaca with a twist baby twist) for me. The other is for a friend. I thought it was a great pattern for cold Minnesota weather!

Thursday, October 14, 2010

Thursday

I decided to knit something small for several friends. So, when one of the people was asked what color he wanted, guess what he said? "Red or black." sigh I am certainly seeing a trend here. I suppose I can't use the excuse that I'm almost out of black yarn? A second person also requested red. Luckily, the other person wants earth tones. Hm, what quick items can I make?

I bought a lot of Kroy sock yarn when we were still in New York from the Paton's outlet (before it closed.) I have FINALLY used almost all of it up! By the time I finish this sweater for Merri I will be out of it. I didn't really think it would ever happen! I have some burgundy Kroy, do you think that counts as red? Actually, I will, now that I think of it, will still have enough enough of the red from this sweater to make a hat or scarf for him. I don't have enough black, but red... Don't know if there will be enough of the red for the second person.

Wednesday, October 13, 2010

Welcome Merri!

This is Merridyth Ann, our new(ish) granddaughter. She was born in July, sorry I've been so lax in keeping up with the blog! I knit the christening gown (finished it the day before we left to meet her!) It is from Knitpicks bare, DK weight. I freely played with the pattern, only the yoke looks as it was designed. That's okay, I complied with Serena's wishes to have a true cable down the skirt, and then a cabled edging instead of a lace edging. The cables in the skirt are the same as the one in the yoke. The edging is Barrington Braid.

Minnesota has been interesting. We have been so busy (and tired) from work that we are still unpacking. The apartment is lovely, the people are so welcoming.

A new game being played in the apartment building: what are they cooking? Long before we moved in, some of the residents started sitting in the hall outside of our apartment and chatting. The comment was made that we have such nice smells coming from our apartment, they usually spend some time trying to figure out what is/was cooking.

This has been a rough year. But, the important thing I am holding on to is that we've made it this far, we can make it! Yeah, I wish Dad had been able to see Merri. That didn't happen. We rejoice in the fact that she is here and is healthy!

As you can see, Justin is taking his role as the big cousin seriously!


On the needles, another Tutti Frutti by Hanne Falkenberg, this one for Miss Merri. For some unknown reason, Mommy wants the exact same colors as I knit the 3 for Justin. That will be 4 sweaters using the same colors and pattern. The only differences has been the sizes. Sigh. I love you guys!

Friday, March 05, 2010

Whew!

I am SO close to finishing these two sweaters for little Justin. I made the first, then realized my gauge was off, so it will fit him next year. I know it is getting late in the year, but I just need to sew in the ends on sweater #2. Actually, sweater #3, as I made it for him (in the same colors) last year.



Okay, so I read the above and guilted myself into sewing in all of the ends before I could take pictures. Now they ARE finished and can be mailed off. Hmmm, looking at the bigger sweater, it may have to wait TWO years to be worn. Does that mean I need to make an intermediate size for next year? I'll find out.

I'll post a picture of Justin wearing it later.

Sunday, February 28, 2010

Still moving slowly

I'm still moving slowly after Dad's death. But, I'm starting to recover.

It helps to know that there is new life on the horizon. Serena and Justin will be parents in July. I'm trying to decide what to knit for Merridyth Ann. At least there is a 95% possibility that it will be Merridyth Ann, known as Merri. I'm going to try to do another 3 generation blanket for her (Mom, me and Serena.) I want each of the grandtads to have that, don't want one to be left out. That means I need to get going soon, to make sure that it happens. I'm thinking cables for this one. Haven't decided quite what, but...

Justin L's winter sweaters for this year and next are almost finished. A couple of more days of knitting on break and lunch and the 3rd will be finished. Then putting it together and sewing in the ends for both. Then they will be mailed off. I'm sorry that this year's is late, but circumstances conspired to lose my momentum.

It has been a colder winter here than normal. I'm so glad that Howard bought the winter coat that he did. When he did I thought (with some private snickering) that he'd wear it a week a year here. Who knew that he'd need it for over a month this year!!!

Thank God that the roof leak has finally stopped! I started off putting one container down. It gradually grew until there were 8 containers in and beside the closet. The roofers came to fix it, the next day it still leaked. But, whatever they did must have taken care of it, for the containers (I didn't dare pick them up) have stayed dry. If only I didn't hear the drip in my dreams, even though it isn't happening!

Not a lot more to post, but I'll try to get more active here. Some days are harder than others, still.

Thursday, December 10, 2009

More photos



Serena and Justin T. Serena saw this coat at Cabelas. The clincher to buy it (and a matching one for Justin T) -- see that fur? It is raccoon. As she says, "Revenge is SWEET!" Remember the raccoon story?Annette was delighted with raccoon fur too, as she has had run-ins with raccoons in the house too. Not to mention that they found that the raccoons were almost in the house when Serena moved out. They figured a few more weeks and the animals would have made it down the chimney -- again!


The two Justins, and they are both smiling! They took to each other immediately.











Justin L with Grandma and Grandpa.











Here is Justin L with his new sweater from Grandma (me.) Daddy (Nathan) is behind Mommy ignoring us. I thought of waiting until Christmas to give it to him, but with weather becoming cold, I thought it would be better for him to have it now.


Nathan, Kim and Justin L left early for the airport. Serena and Justin T left within minutes of us so we went to the airport together. We asked someone else in the waiting area to take our picture together. Turns out he is a professional photographer.

Saturday, May 02, 2009

Knit stuff

I can knit again. Those of you who knit understand, these weeks without knitting have tried me almost to the limit. I finished a pair of Happy Feet socks in the past few days. Okay, not quite finished, I need to graft the toes. But I look forward to wearing them, suddenly my socks are starting to show signs of wear. Part of me whines greatly, the other part looks at my list of completed projects and sees when each pair was finished and is grateful they lasted so long! After all, the latest to develop a hole is from October 2003. I'm going to try to darn the hole, after all, the rest of the sock still has plenty of wear! I started a pair in Kaffe Fassett's Regia Landscape, this time the colors are much better at singing than the earth pair I made last year. I'll let you know as they progress. There is something about the olive green that he includes that icks me. I love the rest of the colors so far. I found myself trying to knit faster, to get PAST the olive, as I reacted so negatively to it. Don't know why.

I'm trying to stay awake to call the apartment office to ask them to please fix the ceiling in our bedroom after bits of the plaster fell when the roof leaked. Part of me wonders why I have to ask that, as they already know of the problem and have reported that the leak(s) repaired. Oh well. Such is the life of a person who works nights as opposed to days. We are asleep when most of the rest of the time zone is awake.

Monday, March 09, 2009

Whee!

My cell phone gave up and stopped working. Serena persuaded us to buy iphones (it hurt so much when she twisted our arms - not!) With this I can check e-mail at lunch, at least most of my accounts.

I fell at work the other night helping a customer get a wide screen tv into his SMALL car. The cardboard on the box gave way as I pulled on it. I waited a day to go in, verdict is a sprain of my hand. No knitting until it heals drat it.

Friday, January 16, 2009

Gack!


I can't believe it has been so long since I posted!

Justin has turned one. Hard to believe that it has been a year! These two pictures were taken about 11 months apart - he has changed a lot in that time! The sweater is the same, the modified Hanne Falkenberg Tutti-Frutti that I knit for him. I don't know if he'll be able to wear it much longer!

I finished the Hanne Falkenberg Plisse Monday. Pictures to come soon, I hope.

Howard and I have both changed jobs as our employers cut hours more and more because of the economy. Just couldn't afford to continue, even though we liked the jobs. We are both enjoying the new jobs. We are working opposing schedules, Howard works nights and I work days/swing. We cherish the few hours we see each other. After all that happened last year, I find that I have very low energy levels. I'm recovering, but it has been a haul.

Yesterday was a bad accessory day. I guess. That's the best way I can think to describe it. I lost my pedometer, my sunglasses, the stick on my shawl pin and broke an earring. Hello? What in the world did I do wrong yesterday? On the drive back to the house I was praying that I wouldn't break my glasses to finish the day! I did bang them and need to get them adjusted, but no break. Whew!

My dad was hospitalized over a week ago with a stroke. He was released Wednesday night to a rehab facility.

Wednesday, May 14, 2008

Oh Bother

I realized last week that I'd changed gauge on the Mermaid as I knit it. Although I'd almost finished the body, I wound up frogging it entirely. I can't believe that I didn't notice, but it happened. It was way too small for the intended victim, so there wasn't a real choice, there isn't a point in giving someone a sweater that doesn't fit. I decided to knit the sleeves first this time, I finished the second one this morning.

Right now I'm starting on a job of sweater repair. It is a sweater that I believe has come something of a Velveteen Rabbit for the owner. He's had it for 37 years and has worn it every winter. It has held up well, but it needs some help.